stock//analyzer~/OKLO
guest@stocks:~❯open OKLO

Oklo Inc. (OKLO)

Oklo designs, builds, and plans to own and operate small factory-built nuclear power plants that sell electricity and heat directly to customers like data centers, utilities, and the military under long-term contracts.
Market cap: ~$6.80B (estimated: price × shares outstanding)
Data as of 2026-08-21
$42.35

Overvalued

Trading about 11% above our estimated fair value of ~$38.00.
Estimated fair value: $38.00 (range $15.00–$85.00)
Today's price
Conservative$15.00 Fair$38.00 Optimistic$85.00
Confidence: Medium
Confidence is Medium (5.7/10): the evidence points clearly in one direction, though it relies in part on normalized estimates, though other available signals point a different way.

What we think

Oklo is a nuclear technology company that is still years away from having a plant up and running, and it only booked its first-ever sales, a little over one million dollars, in the most recent quarter.

The company has about three billion dollars in the bank, which buys it time, but it is spending faster than it is bringing in new business, and it recently had to raise both its spending forecast and the number of shares it sells to investors to fund construction.

Today's stock price already assumes the company's first plant in Idaho starts running on its 2027 to 2028 target and that a real chunk of its long list of interested customers turns into paying contracts, which is a lot to count on in an industry with a long history of delays and cost overruns.

Overvalued, though not dramatically so.

The bull case & the bear case

The bull case

  • If the first Aurora plant in Idaho starts running on schedule in 2027 or 2028, Oklo would be the first company in the country to prove this kind of small nuclear plant actually works, which could unlock a wave of follow-on orders.
  • Growing electricity demand from AI data centers is pushing large tech companies to lock in future power early, and Oklo already has paid, binding interest from customers like Meta and Equinix alongside a much larger list of informal interest.
  • A side business making medical and industrial isotopes could start bringing in real, steady cash well before the first big power plant is finished, giving investors an earlier proof point that the company can execute.

The bear case

  • The company has never built and operated one of these plants before, and nuclear construction projects in the United States have a long history of running years late and costing far more than planned.
  • Almost all of Oklo's customer interest is informal and non-binding, not signed, paying contracts, so a large part of that pipeline may never turn into real revenue.
  • The company keeps selling new shares to pay for construction, which shrinks each existing shareholder's slice of the business, and its spending plans keep growing faster than the market expected.

How famous investors might see it

A quick look at how a few well known investing styles might weigh this stock.

Cathie Woodbacks disruptive high growth

Investors who follow Cathie Wood's approach would frame Oklo as a bet on a disruptive shift in how power-hungry data centers get electricity, pointing to the roughly 12 gigawatts of framework agreements signed with Switch and Meta's own 1.2 gigawatt Ohio deal as evidence that huge future demand already exists. They would treat the still-unbuilt first reactor and zero revenue to date as the price of getting in before the technology is proven at scale.

Chase Colemanbacks category-defining growth platforms

A Chase Coleman-style investor would focus on Oklo's position as one of the furthest-along advanced reactor companies chasing the AI data center power shortage, noting the roughly $788 million in cash on the balance sheet at the end of 2025 as runway to reach construction milestones. They would want to see those framework agreements with Switch and Meta convert into binding, revenue-generating contracts before treating the growth story as confirmed rather than aspirational.

Stanley Druckenmillertrades macro and thematic inflection points

Investors following Stanley Druckenmiller's approach would view Oklo as a way to play the broader theme of AI-driven electricity demand outrunning the power grid's ability to supply it, rather than as a traditional cash-flow investment. They would watch regulatory catalysts, such as the 2026 approval of Oklo's design criteria report and progress on its license application at Idaho National Laboratory, as the near-term signals that either confirm or unwind the thesis.

Warren Buffettbuys durable cash machines at fair prices

A Buffett-style investor would be highly skeptical of Oklo today: the company reported no revenue in any of the last five years, its operating losses widened to about $139 million in 2025 from about $53 million in 2024, and its plan to become a power seller depends on regulatory approvals and a reactor design that has never operated commercially. They would wait for a demonstrated, licensed, cash-generating reactor before considering the stock, since the current price reflects a story rather than a proven business.

Peter Lynchbuys what he understands, checks the numbers

Investors who follow Peter Lynch's approach would like that Oklo's business model is simple to explain, build reactors and sell the power, but would be uneasy that the earnings and cash flow do not yet exist to back up the growth story: the company burned about $82 million in operating cash in 2025, more than double the prior year, with capital expenditures ramping to fund construction. They would treat this as a pre-revenue story stock to watch rather than a name to own on today's fundamentals.

These takes are illustrations of well known investing styles applied to this stock. They are informed guesses, not the actual views, statements, or holdings of the people named.

Are they delivering?

Oklo is hitting real, independently verifiable regulatory and construction milestones toward its first reactor, but the two things that matter most, a completed operating license and paying customers, have not happened yet. The gigawatts of customer demand the company highlights are signed but non-binding framework agreements, not revenue-generating contracts, and the flagship Air Force base project has a history of being paused once before.

Oklo says it is on track to bring its first commercial Aurora powerhouse at Idaho National Laboratory online by late 2027 or early 2028.mixed

Independent, third-party-reported milestones back real progress: Oklo broke ground at the Idaho site in September 2025 with Kiewit as lead constructor, the Department of Energy approved a nuclear safety design agreement, and in May 2026 the NRC approved the plant's principal design criteria topical report on an accelerated schedule. However, the combined license application that must be approved before the reactor can legally operate is still in progress, so the 2027-2028 target remains unproven until the NRC actually grants that license.

Oklo points to roughly 12 gigawatts of power agreements with data center operator Switch and a 1.2 gigawatt deal with Meta in Ohio as proof of strong customer demand.mixed

Switch's and Meta's own public announcements confirm these deals exist, but both are structured as non-binding master framework agreements rather than signed, binding power purchase contracts, meaning individual projects and firm pricing still need to be negotiated site by site. Oklo's own SEC filings show zero recorded revenue in any year through 2025, consistent with these being future pipeline rather than contracted, paying business today.

Oklo says it has been selected to build the U.S. military's first commercial microreactor at Eielson Air Force Base in Alaska under a 30-year power contract.unproven

The Department of the Air Force and Defense Logistics Agency issued their own public notice of intent to award reaffirming Oklo's selection in June 2025, which is independent confirmation the government picked Oklo. But the underlying contract is still contingent on Oklo first obtaining an NRC license, and a similar award to Oklo for the same base was issued and then rescinded back in 2023, so a signed, binding 30-year contract is not yet in hand.

Based on public evidence such as filings, customer announcements, and delivery records.

Key numbers

Revenue growth (3-yr avg)
N/A
Revenue growth (latest year)
Not available
Gross margin
N/A
Operating margin
N/A
Cash generation
N/A
Return on capital
-19.4%
Debt level
Net cash $787.5M
Growth priced in
On-time 2028 startup plus real customer contracts materializing

How this company makes money

Oklo does not sell reactors. Its plan is to build compact fast reactors called Aurora powerhouses, keep ownership of them, and sell the electricity and heat they produce to a customer under a long-term power contract, similar to how a power plant operator sells electricity rather than selling the plant itself. The company has not yet completed a reactor or booked any revenue; its near-term work is regulatory approval, construction, and lining up long-term power deals with data center operators, industrial customers, and government sites.

What would change our view

We'd revisit this call if the price falls below $15.00 or rises above $85.00.

These are review triggers for us to take another look, not price targets or a promise the stock will reach them.

guest@stocks:~/OKLO❯view OKLO deep-analysis

Peer Comparison

Peer benchmark data not available.

Deep Analysis: Fundamentals

** Oklo is a pre-commercial advanced nuclear company with three lines of business: Aurora Powerhouse (microreactor power generation, pre-revenue), fuel recycling (planned Oak Ridge, TN facility, pre-revenue), and isotopes/specialty manufacturing (Atomic Alchemy, Groves reactor, plus the 2026 ARMEC and Creative Engineers acquisitions). It has no operating power plant and no formal operating segments. Its history has under four years of any revenue or EPS data, which is why the automated screen correctly declined to score it (gate: revenue years=0, eps years=2).

Deep Analysis: Income Statement

** Q2 2026 revenue was $1.21 million, the company's first ever, versus $0 in Q2 2025 and $0 in Q1 2026, from $800K engineering/consulting, $168K manufacturing/fabrication, and $242K other, tied to the 2026 acquisitions. Q2 2026 net loss was $48.5 million (adjusted EPS -$0.28) versus a $33.1 million net loss in Q1 2026 and a $24.7 million net loss in Q2 2025. First-half 2026 operating loss was $124.2 million, partly offset by $44.5 million of net interest and dividend income (source: Oklo Q2 2026 results, businesswire.com, 2026-08-07).

Deep Analysis: Cash Flow

** Quarterly operating cash flow has moved from -$18.5M (Q2 2025) to -$18.0M (Q3 2025) to -$33.4M (Q4 2025) to -$17.9M (Q1 2026) to -$47.6M (Q2 2026). Capex has accelerated sharply: -$0.9M, -$5.1M, -$27.0M, -$32.8M, -$94.1M over the same five quarters. Trailing-twelve-month free cash flow (Q3 2025 through Q2 2026) is approximately -$276 million, versus a full fiscal-2025 baseline of about -$115 million (OCF -$82.2M, capex $33.2M) in the normalized EDGAR series the automated screen was built from. Full-year 2026 guidance was raised this quarter to $120-150M operating cash use and $400-500M capex, roughly double the prior guide (source: Oklo Q2 2026 results, stockanalysis.com quarterly financials, accessed 2026-08-21).

Deep Analysis: Balance Sheet

** Cash and marketable securities were $3.0 billion at June 30, 2026 ($1.6B cash/equivalents, $1.4B marketable securities), up from $2.5 billion at March 31, 2026 and $0.88 billion at December 31, 2025, funded largely by a $1.5 billion at-the-market equity program disclosed December 4-5, 2025 (about 15.8 million shares sold). Shares outstanding rose from 137.7 million (fiscal year-end 2024) to 160.5 million (fiscal year-end 2025) to 186.0 million as of the August 7, 2026 10-Q cover page, roughly 35% growth in 20 months. Total debt is minimal (under $1.5 million in each of the last three years per the normalized series).

Deep Analysis: Key Metrics

** See the Q10 KPI pack in the checklist for the full comparison table (revenue, cash, guidance, share count, pipeline, and regulatory status, each with source and date).

Deep Analysis: Peer Comparison

** NuScale Power (SMR) is the closest public peer and remains the only US company with an NRC design-certified SMR; Oklo has not yet received NRC design approval or a final combined license for Aurora. NuScale's near-term path leans on utilities and large power providers, while Oklo is chasing a broader mix of data centers, industrial sites, and government customers (source: Motley Fool, NuScale vs Oklo, 2026-03-06).

Deep Analysis: Macro Environment

** AI data center electricity demand and a supportive federal posture toward advanced nuclear, including DOE's Reactor Pilot Program that fast-tracked the Groves reactor from groundbreaking to first criticality in 11 months, are the main tailwinds. Rate and capital markets conditions matter less directly since Oklo is funding itself with equity, not debt, but a weaker equity market or renewed AI-capex skepticism would directly pressure its ability to keep raising cash cheaply.

Deep Analysis: Insider Activity

** Sam Altman, an early backer and former board chairman, stepped down from the chairman role in April 2025 to avoid a conflict of interest given OpenAI-Oklo commercial discussions; he remains a major shareholder. Public reporting references insider open-market sales in March and July 2026, though specific Form 4 details were not independently itemized here (source: SEC Form 4 filings, referenced via secondary reporting, 2026).

Deep Analysis: Catalysts & Risks

** Catalysts: DOE readiness review/startup approval for Groves; further conversion of letters of intent (Switch, Equinix, Diamondback, Meta) into binding, prepaid contracts; NRC action on the Aurora-INL combined license. Risks: nuclear construction delay and cost-overrun history (Vogtle 3&4 ran about 7 years late and roughly 2x over original budget); continued heavy dilution; guidance already raised twice in 2026 without matching revenue growth; almost all customer pipeline is non-binding.

Deep Analysis: Disconfirming Evidence & Falsification

** Cash-use and capex guidance were both raised in the same quarter the company announced its first revenue, and share count grew about 35% in 20 months, both signs that capital needs are outrunning monetization. Falsification trigger: a public delay to the 2027-2028 Aurora-INL commercial operation target, or a material NRC schedule slip, would undercut the near-term bull case.

Deep Analysis: Thesis Review Bands

** Bear ($15-18): Aurora-INL delays past 2028, pipeline mostly fails to convert, stock re-rates toward net cash plus modest optionality. Base ($35-45): Aurora-INL lands close to the 2027-2028 target, isotopes revenue ramps modestly, low-single-digit GW of the pipeline converts to binding contracts by the early 2030s. Bull ($70-100): accelerated regulatory pace (as shown at Groves) extends to Aurora-INL and other sites, a meaningful share of the 14 GW pipeline becomes binding and prepaid, and Oklo achieves real fleet economics by the early 2030s.

Analyst Checklist, Key Metrics & Key Facts

Analyst Checklist

Implied growth (reverse-DCF)N/A
Rule of 40 (rev growth + FCF/EBIT margin)N/A
Fear vs. Hope
The fear is that Oklo repeats the pattern common to first-of-a-kind US nuclear projects, cost overruns and multi-year delays, while continuing to dilute shareholders to fund construction before any real cash flow arrives. The hope is that Oklo becomes the first US company to operate a privately financed advanced reactor and rides the AI-driven data center power boom into a multi-decade build-out of its roughly 14 GW of customer interest.
Is It Priced Correctly?
With an enterprise value of roughly $4.9 billion (market cap near $7.9 billion on 186.0 million shares at about $42, less about $3.0 billion of net cash) against a single 75 MWe first plant targeted for 2027-2028 and effectively zero binding revenue today, the price already assumes the base case (on-schedule Aurora-INL plus partial pipeline conversion) plays out, leaving little margin for the execution risk that is typical of this industry.
Inflection Signals
The next hard inflection points are the NRC's decision on the Aurora-INL combined license (the first-ever COLA filed for an advanced fission design) and the DOE's readiness review and startup approval for the Groves isotope reactor, which has already cleared its Documented Safety Analysis and achieved first criticality in August 2026.
Reverse-DCF Reality Check
No US company has ever taken a privately financed advanced or microreactor design from groundbreaking to a commercially operating multi-site fleet on the timeline the current price implies. The closest analog at utility scale, Vogtle Units 3 and 4, took roughly seven years longer than planned and cost close to double its original budget, which is the relevant base rate for judging how much confidence to place in Oklo's 2027-2028 target.
Unpriced Optionality
The Atomic Alchemy isotopes business built around the Groves reactor could generate medical and industrial isotope revenue well before the Aurora-INL power plant is finished, offering an earlier, smaller proof point that investors focused on the marquee microreactor story may be under-weighting. Oklo's proposed fuel recycling facility in Oak Ridge, Tennessee is a second, less-followed revenue path tied to US domestic nuclear fuel security policy.
Disconfirming Evidence
  • In the same quarter Oklo touted its first-ever revenue, it also raised its full-year 2026 operating cash-use guidance from $80-100 million to $120-150 million and its capital expenditure guidance from $350-450 million to $400-500 million, indicating spending is outrunning monetization rather than converging with it (Oklo Q2 2026 results, businesswire.com, August 7, 2026).
  • Shares outstanding rose from about 137.7 million at the end of fiscal 2024 to roughly 186.0 million as of the 10-Q cover page dated August 7, 2026, a roughly 35% increase in about 20 months, funded largely by a $1.5 billion at-the-market equity program that was executed mostly at prices well above the current price (Oklo Form 10-Q, June 30, 2026, filed August 7, 2026; ATM 8-K disclosed December 4-5, 2025).
Falsification Condition
The near-term bull case would be falsified by either of two specific, observable events: Oklo publicly pushing the Aurora-INL commercial operation date beyond the current 2027-2028 DOE-targeted window, or the NRC combined license review for Aurora-INL slipping materially past its currently disclosed schedule.
Catalyst Horizon
Near term (6-18 months): DOE readiness review and startup approval for Groves turning isotope revenue on; any conversion of the Meta, Equinix, or Diamondback letters of intent into additional binding, prepaid contracts; incremental NRC action on the Aurora-INL combined license. Medium term (2027-2028): completion of Aurora-INL construction and the targeted commercial startup of the first plant.
Segments
Oklo does not report formal operating segments given its pre-commercial stage, but its business breaks into three lines: Aurora Powerhouse (power generation, still pre-revenue, targeting commercial operation at Idaho National Laboratory in 2027-2028), fuel recycling (planned Oak Ridge, Tennessee facility, pre-revenue), and isotopes/specialty manufacturing (Atomic Alchemy plus the 2026 acquisitions of ARMEC and Creative Engineers), which produced essentially all of Oklo's first reported revenue: $1.21 million in Q2 2026, made up of about $800,000 of engineering and consulting services, $168,000 of manufacturing and fabrication services, and $242,000 of other activities (Oklo Q2 2026 results, businesswire.com, August 7, 2026).
KPI Pack
  • quarterly_revenue: $1.21 million in Q2 2026 vs $0 in Q2 2025 and $0 in Q1 2026; company's first-ever reported revenue, driven by 2026 acquisitions (Oklo Q2 2026 results, August 7, 2026)
  • cash_and_marketable_securities: $3.0 billion at June 30, 2026 ($1.6 billion cash and equivalents plus $1.4 billion marketable securities) vs $2.5 billion at March 31, 2026 and $0.88 billion at December 31, 2025; peer NuScale Power's cash position is UNAVAILABLE from sources reviewed here
  • annual_cash_use_guidance: Raised to $120-150 million operating cash use and $400-500 million capital expenditures for full-year 2026, up from $80-100 million and $350-450 million respectively as of the prior quarter (Oklo Q2 2026 results, August 7, 2026)
  • shares_outstanding: 186.0 million as of August 7, 2026 (10-Q cover page) vs 160.5 million at fiscal year-end 2025 and 137.7 million at fiscal year-end 2024, roughly 35% growth in 20 months
  • contracted_pipeline: Approximately 14 GW of non-binding letters of intent (anchored by the 12 GW Switch master power agreement signed December 2024); binding, funded capacity is materially smaller, on the order of low single-digit GW, anchored by prepaid agreements with Meta and Equinix; peer NuScale's disclosed pipeline is UNAVAILABLE from sources reviewed here
  • regulatory_status: Aurora-INL combined license application under NRC review (first-ever COLA for an advanced fission design), DOE preliminary safety analysis approved; Groves isotope reactor's Documented Safety Analysis approved by DOE and first criticality achieved August 2026, moving into DOE's final pre-startup review; peer NuScale is the only US company with an NRC design-certified SMR, a regulatory milestone Oklo has not yet reached

Key Metrics (TTM)

FCF Yield
-2.3%
ROIC
-19.4%
Operating Margin
N/A
EV/EBITDA
-43.31x

Key Facts

  • Oklo reported its first-ever quarterly revenue of $1.21 million in Q2 2026, versus $0 in Q2 2025, driven by 2026 acquisitions of ARMEC and Creative Engineers (Oklo Q2 2026 results, August 7, 2026).
  • Q2 2026 net loss was $48.5 million, up from a $33.1 million net loss in Q1 2026, and year-to-date operating loss was $124.2 million (Oklo Q2 2026 results, August 7, 2026).
  • Oklo ended Q2 2026 with $3.0 billion in cash and marketable securities, up from $2.5 billion at the end of Q1 2026 (Oklo Q2 2026 results, August 7, 2026).
  • Full-year 2026 guidance was raised to $120-150 million of operating cash use and $400-500 million of capital expenditures, up from $80-100 million and $350-450 million previously (Oklo Q2 2026 results, August 7, 2026).
  • Shares outstanding grew from 137.7 million at fiscal year-end 2024 to 186.0 million as of the August 7, 2026 10-Q cover page, funded in large part by a $1.5 billion at-the-market equity program disclosed December 4-5, 2025 and fully executed by mid-2026.
  • Oklo's Groves isotope test reactor in Texas achieved first criticality in August 2026, about 11 months after breaking ground, after the DOE approved its Documented Safety Analysis on July 1, 2026 (Oklo/DOE announcement, July 1, 2026; Q2 2026 earnings call).
  • The flagship Aurora-INL plant (75 MWe) broke ground at Idaho National Laboratory in September 2025 and remains targeted for commercial operation in late 2027 or early 2028, pending NRC combined license review, the first such application ever filed for an advanced fission design (PowerMag, ANS Nuclear Newswire, 2025-2026 reporting).
  • Oklo's contracted customer pipeline is roughly 14 GW of mostly non-binding letters of intent, anchored by a 12 GW master power agreement with data center developer Switch signed December 18, 2024; binding, funded capacity is much smaller, anchored by prepaid agreements with Meta (1.2 GW Ohio campus, January 2026) and Equinix (500 MW, $25 million prepayment).
  • Oklo stock is down roughly 71-78% from its 2025 highs (as high as $193.84 in the 52-week range) amid dilution concerns from the ATM program and fading sector enthusiasm, even as the company hit operational and regulatory milestones through mid-2026 (Motley Fool, July 11, 2026; market data, August 2026).
  • NuScale Power remains the only US company with an NRC design-certified SMR; Oklo's Aurora design has not yet received NRC design approval or a final combined license (Motley Fool NuScale vs Oklo comparison, March 2026).
Sources (filings & articles used)
Detailed metrics (for analysts)raw model output only. Layer 1 / Layer 2 methodology, conviction, classification. Peer comparison, Deep Analysis and the checklist are shown above.
ClassMATURE
Quality profileMATURE_STABLE

Consensus

Layer 1 · Mechanical screen

NO VERDICT
Mispricing scoreNot available.
ConvictionNORMAL
Model primary IVNot available.
Model relative IV (peer)Not available.
Model blended IVNot available.

Mechanical model output, a screen, not a fair value.conservative screen, understates growth/AI-capex names

Layer 2 · Research (final say)

OVERVALUED
Relationship to L1DATA_INVALID

A scenario-weighted valuation (bear/base/bull, driven mainly by whether the Aurora-INL plant reaches commercial operation on the 2027-2028 target and how much of the roughly 14 GW of non-binding customer interest converts into paid, financed contracts) puts fair value at or below the current price. The market already appears to be paying for on-schedule execution and real pipeline conversion despite the company having booked only about one million dollars of total revenue to date.

Today's price
Conservative$15.00 Fair$38.00 Optimistic$85.00
DATA CAUTION

Research flagged that one or more mechanical-screen inputs look invalid or distorted (e.g. a data-extraction issue or a capex/FCF definition mismatch); the research verdict was independently re-derived from primary filings, not just a check on the same numbers.

Confidence score breakdown

Research sub-score (70% weight)6.0 / 10
Mechanical sub-score (30% weight)5.0 / 10
Weighted confidence score5.7 / 10 → Medium

Confidence = 0.7 × research sub-score + 0.3 × mechanical sub-score. Mechanical sub-score rewards the Layer 1 screen for agreeing with Layer 2's direction (corroboration), not just for being conviction=NORMAL in isolation.

Data Integrity

Data Notes

  • DEGRADEDno valid peer set (G4): relative valuation nulled; composite = 100% IV_primary

Risk Flags

  • UNSCORABLE_HISTORY
Educational information only, not investment advice.
guest@stocks:~/OKLO❯